Labels
- Construction (62)
- Research and Planning (53)
- Creative Tasks (8)
- Evaluation (5)
- Final Product (4)
Monday, 13 November 2017
Filming Diary (Performance - Nov 11th)
Today we filmed for the second, this time at a indoor studio location for the performance side of the video. Overall, filming went well. We booked the studio 1-4 and found this the perfect amount of time needed to set the equipment up and film carefully and considerably. I think that we captured a variety of good footage, not facing any major issues along the way. We used two cameras (each equipped with tripods) to gain more footage which will without a doubt improve the outcome of our final product. The only minor issue we had at the shoot was a technical one. One of the camera SD Cards corrupted but all of the footage was saved on the laptop so for the last hour of the shoot we were limited to one camera. We got all of the song lip synced and filmed- on tripod completely and also the majority handheld in separate clips. This should give us plenty of adequate footage to work with. Please see the images above to show the equipment we used and how we set up for filming on the day. We also developed a checklist for the day so that filming went as smoothly as possible...
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment